Kenya Rabai 90MW Thermal Power Plant & Grid Substation

Rabai, Kilifi County, Republic of Kenya | 90MW Heavy Thermal Generation Complex, 132kV High-Voltage Grid Substation & Fuel Storage Infrastructure

Rabai, Kilifi, Kenya
90MW Baseload Capacity
132kV Grid Substation
Client: KPLC / Ministry of Energy
National Grid Stability

Landmark East African Sovereign Power Generation Facility

The Kenya Rabai 90MW Thermal Power Plant & Grid Substation is a premier sovereign energy infrastructure development constructed in Rabai, Kilifi County, near Mombasa, Republic of Kenya. Commissioned under national utility expansion plans with Kenya Power & Lighting Company (KPLC) and the Ministry of Energy, the project was engineered and executed by GY & Sons Holding in joint venture with international power engineering consortia to provide reliable baseload electricity to the Kenyan coast and national power grid.

Engineered to rigorous international utility reliability benchmarks, the plant comprises high-efficiency heavy thermal generation engines equipped with closed-circuit cooling systems, exhaust gas heat recovery, dual 10,000 m³ heavy fuel oil storage facilities, and an integrated 132kV high-voltage step-up switchyard connecting directly to the Mombasa–Nairobi national transmission corridor.

90 MW

Gross Power Output

Continuous thermal baseload generation powering industries, coastal port logistics, and urban households.

132 kV

High-Voltage Substation

Integrated step-up transformer substation and SF6 gas-insulated switchgear connected to the KPLC grid.

20,000 m³

Fuel Storage Complex

Twin 10,000 m³ heavy fuel oil storage tanks with heating coils, fuel purifiers, and offloading manifolds.

98.5%

Plant Availability

Demonstrated utility-grade availability factor supporting East Africa's economic development corridor.

Certified Engineering Material Quantities

Key technical metrics and material quantities certified by the lead project consultants and Kenya Power & Lighting Company inspection engineers:

Engineering Component Quantity / Metric Technical Description
Installed Generation Capacity 90 MW (Net Grid Output) Multi-unit heavy fuel oil thermal generator train with exhaust turbocharging
Grid Interconnection Voltage 132 kV Step-Up Substation Dual step-up power transformers, circuit breakers, and KPLC dispatch SCADA interface
Reinforced Concrete Foundations 28,500 m³ Vibration-isolated reinforced concrete machine foundation blocks and bund containment walls
Bulk Fuel Storage Tanks 2 x 10,000 m³ (20,000 m³ Total) Double-bottom carbon steel storage tanks with steam thermal tracing and automated safety shutdown
Exhaust Heat Recovery & Silencing Multi-Stage Silencers Emissions abatement filtration and high-attenuation silencers meeting World Bank environmental guidelines
Plant Footprint & Industrial Compound 85,000 m² Enclosed industrial complex with access roads, administrative block, and security perimeters

Authentic Project Visual Gallery

High-resolution photographs extracted from the official corporate project archives showcasing the completed Rabai 90MW power plant complex, heavy generation engine blocks, 132kV grid substation switchyard, and auxiliary systems: