Infrastructure & Expressway Networks

Ashgabat Candibil 47km Expressway & Interchange Network

Ashgabat, Turkmenistan | Major 46.9 km Capital Arterial Highway, Dual 2x2 Carriageway, Secondary Feeder Network & 3 Elevated Interchange Viaduct Bridges

Ashgabat, Turkmenistan
46.9 km Highway Network
4,405,742 m³ Earthworks
640k+ Tons Asphalt Paving
3 Elevated Interchange Bridges
2009 – 2011

Strategic Capital City Arterial Expressway

The Ashgabat Candibil Highway & Expressway Network represents one of Turkmenistan's flagship capital urban redevelopment civil engineering achievements. Built to modernize and streamline traffic circulation throughout the capital city of Ashgabat, the comprehensive infrastructure contract comprised 24.5 km of 2x2 dual-lane main arterial expressway, 22.4 km of secondary feeder side roads, and 3 grade-separated elevated interchange bridges.

Executed under a high-priority state development mandate by GY & Sons Holding in joint venture with strategic international engineering partners (KlasTeknik Consortia), the project scope covered full earthworks, subbase compaction, multi-layer bituminous asphalt surfacing, storm drainage installation, LED avenue lighting, and bridge viaduct construction.

46.9 km

Network Distance

24.5 km 2x2 dual carriageway expressway + 22.4 km secondary feeder roads.

4.4M m³

Earthworks Volume

4,405,742 m³ cut excavation and heavy structural backfill embankment compaction.

640k+ Tons

Bituminous Asphalt

Heavy-duty multi-layer asphalt base, binder, and wearing surface course paving.

3 Bridges

Interchange Bridges

Grade-separated elevated interchange viaduct bridges ensuring uninterrupted traffic flow.

Certified Engineering Material Quantities

The structural construction and road formation relied on precise geotechnical soil stabilization and certified bituminous paving formulations executed according to international highway standards:

Construction Works Category Certified Volume / Tonnage Engineering Function
Earthworks & Embankment Fill 4,405,742 m³ Site clearing, heavy cut excavation, and multi-layer structural subgrade embankment backfill.
Plant-Mix Subbase Granular Layer 630,000 m³ Dense-graded crushed stone base layer prepared in automated mixing plants for load distribution.
Bituminous Base Course 315,668 Tons Heavy-duty structural asphalt base layer designed to resist heavy vehicle axle loads.
Binder Asphalt Layer 150,469 Tons Interlocking intermediate asphalt binder course bridging base and surface wearing course.
Bituminous Surface Wearing Layer 174,906 Tons High-friction, skid-resistant premium asphalt surface wearing course for maximum safety.
Interchange Viaduct Structures 3 Complex Viaducts Post-tensioned reinforced concrete bridge spans and elevated multi-directional ramps.

Authentic Construction Visual Gallery

High-resolution photographs from the official project site archives showcasing heavy asphalt paving fleets, BOMAG compaction rollers, and heavy earthworks machinery in Ashgabat: